C-KINGDOM CABLE

CRAFTED WITH IMPECCABLE QUALITY


Uzbekistan Hydropower Station Renovation Project (Tashkent No. 1 Hydropower Station)

图片名称

Contract Date

2022/6/7


Application Products

Control Cable;
Industrial signal transmission cable with double shielding structure

Country

Uzbekistan


Project Overview

This project, hailed as a benchmark power station in Uzbekistan, is an upstream cascade power station in the "one reservoir, six cascades" development plan for the Yarkand River basin. It was upgraded with the participation of General Technology International and Huazi Technology Co., Ltd.